Last March I posted a to-do list for sprint, summer, and fall. Status update is below.

The list of stuff to get done this spring/summer/fall -

Grain bin turned Chicken house - get ready for summer, install false ceiling, electricity, and heater before november I got made fun of a lot for this (scowls). Some people even insisted I was going to install air conditioning. Electricity will be done in the next couple of weeks for this, mainly for a light and a heater to put in the bowl so the water won't freeze. I'll be putting some strategically placed hay bales in there so the birds can huddle in a warm place if necessary.
rebuild front porch - roof done, new supports placed, stone columns do be rebuilt in spring.
remove bees from front porch column - done - hive was dead so this was less complicated than we thought.
new roof on both porches - done
repair main roof - we reroofed it - done and done!
repair/replace gutters - skipped gutters - might install in spring, might not be necessary.
paint house - mostly done - we need to rent a cherry picker to finish since we can't walk the metal roof, will probably have to happen in spring now.
weatherize addition and basement This'll be done before Christmas
cut enough firewood to last through next winter - we have a lot, but the stove isn't in. Not sure if it's enough, we'll see.
line chimney - still working with the chimney folks on this, hopefully before christmas.
fix enough fence for us to get a bred milk cow next spring - We'll be doing some fencing, though I'm not sure if it will be used for this or not. Might have to wait until spring if the ground freezes soon.
clean out haunted chicken house and make sure it's in good enough shape to use as shelter for the cow when necessary - done
rock driveway (and the casbah) - only the casbah was rocked.
clean up trash and get a big brush burn done - (last on list since ground can be frozen when we do this) lots of trash removed from property, still a lot of burning and removal to go.

I also posted a tentative to do list for sprint/summer -

Get Bees - still on the list
replace main roof - done!
change the opening for the old basement garage into wall with exterior bulkhead door and storm shelter - maybe . . . maybe not.
prepare fence and housing for bred sow to be purchased spring of 2011 - We may be bumping this up to this spring.
fence and shelter for sheep in spring of 2011? - still on the list
expand cow facilities? - hmm - I think this meant fence the actual pasture. We'll have to see - that's going to be expensive.
prepare for brooding hens to hatch spring of 2011 - I need to have a good place to hatch the meat chickens this year - it'll probably happen in garage.
finish junk cleanup - we'll settle for making progress. There is a lot of junk.

That's the update. I'll post a new to-do before the year is out.

2 comments:

  1. You guys rock!! Now don't forget to enjoy Thanksgiving. :)

    ReplyDelete
  2. Wow! Y'all are way proud, right?

    Thanks for sharing,

    Pamela

    ReplyDelete

A blog about farming, unschooling, feminism, 22q deletion syndrome, cooking real food, homesteading, permaculture, and motherhood.